CISCO CCNA 200-301 Q46

An engineer is asked to protect unused ports that are configured in the default VLAN on a switch. Which two steps will fulfill the request? (Choose two)

A. Configure the ports in an EtherChannel.
B. Administratively shut down the ports
C. Configure the port type as access and place in VLAN 99
D. Configure the ports as trunk ports
E. Enable the Cisco Discovery Protocol

Correct Answers: B, C